News & Press Release -Headsup B2B enters into partnership with INA Solar
- Published onPublisher logo for "Headsup B2B enters into partnership with INA Solar"Publisher logo for "Headsup B2B enters into partnership with INA Solar"Publisher logo for "Headsup B2B enters into partnership with INA Solar"Publisher logo for "Headsup B2B enters into partnership with INA Solar"Publisher logo for "Headsup B2B enters into partnership with INA Solar"
News & Press Release -Headsup B2B Secures Mandate for 40+ MW of Solar Panels and Ancillary Products Across Rajasthan and Jharkhand
- Published onPublisher logo for "Headsup B2B Secures Mandate for 40+ MW of Solar Panels and Ancillary Products Across Rajasthan and Jharkhand"
News & Press Release -Headsup B2B Secures Rs. 16.65 Crore Debt Capital to Accelerate Growth and Innovation
- Published onPublisher logo for "Headsup B2B Secures Rs. 16.65 Crore Debt Capital to Accelerate Growth and Innovation"
News & Press Release -India’s Green Steel Push Faces Credibility Test As Emissions Rise Despite Net-Zero Pledges
- Published onPublisher logo for "India’s Green Steel Push Faces Credibility Test As Emissions Rise Despite Net-Zero Pledges"
News & Press Release -The Pulse of Progress: Industry Voices on Technological Evolution
- Published onPublisher logo for "The Pulse of Progress: Industry Voices on Technological Evolution"
News & Press Release -India’s Technology Day: From Shakti to Superintelligence—The Nation’s $1 Trillion Digital Bet
- Published onPublisher logo for "India’s Technology Day: From Shakti to Superintelligence—The Nation’s $1 Trillion Digital Bet"
News & Press Release -National Technology Day 2026: Industry Leaders Speak on Next Tech Boom and ₹1 Lakh Crore R&D Bet on Deep-Tech
- Published onPublisher logo for "National Technology Day 2026: Industry Leaders Speak on Next Tech Boom and ₹1 Lakh Crore R&D Bet on Deep-Tech"
News & Press Release -National Technology Day: Shaping India’s tech future responsibly
- Published onPublisher logo for "National Technology Day: Shaping India’s tech future responsibly"
News & Press Release -Stock Market Highlights, Sensex Today: Sensex Falls 1,312 Points, Nifty Down 360 As Oil Prices Rally
- Published onPublisher logo for "Stock Market Highlights, Sensex Today: Sensex Falls 1,312 Points, Nifty Down 360 As Oil Prices Rally"
News & Press Release -Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder
- Published onPublisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"
News & Press Release -Headsup B2B Targets INR 400 Crore Revenue Via Integrated Infrastructure Services Expansion
- Published onPublisher logo for "Headsup B2B Targets INR 400 Crore Revenue Via Integrated Infrastructure Services Expansion"
News & Press Release -What’s next in India’s EV (r)evolution?
- Published onPublisher logo for "What’s next in India’s EV (r)evolution?"
News & Press Release -Why Off-Grid Solar + Battery Storage Could Shape India’s Next Phase of Industrial Energy
- Published onPublisher logo for "Why Off-Grid Solar + Battery Storage Could Shape India’s Next Phase of Industrial Energy"
News & Press Release -Headsup B2B targets next growth phase with solar push, plans fundraise
- Published onPublisher logo for "Headsup B2B targets next growth phase with solar push, plans fundraise"
News & Press Release -Smart Energy Magazine - The Growing Importance of Technology-led Procurement and Supply Chain Platforms in Enabling Renewable Energy Projects
- Published onPublisher logo for "Smart Energy Magazine - The Growing Importance of Technology-led Procurement and Supply Chain Platforms in Enabling Renewable Energy Projects"
News & Press Release -Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar
- Published onPublisher logo for "Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar"Publisher logo for "Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar"Publisher logo for "Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar"Publisher logo for "Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar"
News & Press Release -Headsup B2B enters into partnership with INA Solar
- Published onPublisher logo for "Headsup B2B enters into partnership with INA Solar"Publisher logo for "Headsup B2B enters into partnership with INA Solar"Publisher logo for "Headsup B2B enters into partnership with INA Solar"Publisher logo for "Headsup B2B enters into partnership with INA Solar"Publisher logo for "Headsup B2B enters into partnership with INA Solar"
News & Press Release -Headsup B2B Secures Mandate for 40+ MW of Solar Panels and Ancillary Products Across Rajasthan and Jharkhand
- Published onPublisher logo for "Headsup B2B Secures Mandate for 40+ MW of Solar Panels and Ancillary Products Across Rajasthan and Jharkhand"
News & Press Release -Headsup B2B Secures Rs. 16.65 Crore Debt Capital to Accelerate Growth and Innovation
- Published onPublisher logo for "Headsup B2B Secures Rs. 16.65 Crore Debt Capital to Accelerate Growth and Innovation"
News & Press Release -India’s Green Steel Push Faces Credibility Test As Emissions Rise Despite Net-Zero Pledges
- Published onPublisher logo for "India’s Green Steel Push Faces Credibility Test As Emissions Rise Despite Net-Zero Pledges"
News & Press Release -The Pulse of Progress: Industry Voices on Technological Evolution
- Published onPublisher logo for "The Pulse of Progress: Industry Voices on Technological Evolution"
News & Press Release -India’s Technology Day: From Shakti to Superintelligence—The Nation’s $1 Trillion Digital Bet
- Published onPublisher logo for "India’s Technology Day: From Shakti to Superintelligence—The Nation’s $1 Trillion Digital Bet"
News & Press Release -National Technology Day 2026: Industry Leaders Speak on Next Tech Boom and ₹1 Lakh Crore R&D Bet on Deep-Tech
- Published onPublisher logo for "National Technology Day 2026: Industry Leaders Speak on Next Tech Boom and ₹1 Lakh Crore R&D Bet on Deep-Tech"
News & Press Release -National Technology Day: Shaping India’s tech future responsibly
- Published onPublisher logo for "National Technology Day: Shaping India’s tech future responsibly"
News & Press Release -Stock Market Highlights, Sensex Today: Sensex Falls 1,312 Points, Nifty Down 360 As Oil Prices Rally
- Published onPublisher logo for "Stock Market Highlights, Sensex Today: Sensex Falls 1,312 Points, Nifty Down 360 As Oil Prices Rally"
News & Press Release -Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder
- Published onPublisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"Publisher logo for "Headsup B2B sees Rs 2,500 cr revenue by 2030: Founder"
News & Press Release -Headsup B2B Targets INR 400 Crore Revenue Via Integrated Infrastructure Services Expansion
- Published onPublisher logo for "Headsup B2B Targets INR 400 Crore Revenue Via Integrated Infrastructure Services Expansion"
News & Press Release -What’s next in India’s EV (r)evolution?
- Published onPublisher logo for "What’s next in India’s EV (r)evolution?"
News & Press Release -Why Off-Grid Solar + Battery Storage Could Shape India’s Next Phase of Industrial Energy
- Published onPublisher logo for "Why Off-Grid Solar + Battery Storage Could Shape India’s Next Phase of Industrial Energy"
News & Press Release -Headsup B2B targets next growth phase with solar push, plans fundraise
- Published onPublisher logo for "Headsup B2B targets next growth phase with solar push, plans fundraise"
News & Press Release -Smart Energy Magazine - The Growing Importance of Technology-led Procurement and Supply Chain Platforms in Enabling Renewable Energy Projects
- Published onPublisher logo for "Smart Energy Magazine - The Growing Importance of Technology-led Procurement and Supply Chain Platforms in Enabling Renewable Energy Projects"
News & Press Release -Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar
- Published onPublisher logo for "Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar"Publisher logo for "Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar"Publisher logo for "Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar"Publisher logo for "Headsup B2B Listed as National Vendor on PM Surya Ghar Portal for Rooftop Solar"
Research report·Published 20 October 2026·10 min read
whatsapp share
x share
linkedin share
instagram share
facebook share

India Rooftop Solar Market 2026: After 51 Lakh Homes, What Has Changed for Supply Chains and Vendors

PM Surya Ghar has taken rooftop solar from a decade-long trickle to a mass programme. This report looks at where the market stands, the pace needed to reach 1 crore homes by March 2027, why domestic cells have become the bottleneck, and what it all means for vendors.

~51.7 lakh
Rooftop installations (9 Oct 2026)
~33.4 GW
Cumulative rooftop solar (Sep 2026)
37,000+
Registered PM Surya Ghar vendors
₹8–11/W
Approx. DCR module premium
PM Surya GharDemandDCR supplyVendorsOutlook

Headsup B2B Research · Data as of 15 October 2026 · Next review: January 2027. Sources are listed in the References section.

Key findings
  1. PM Surya Ghar had crossed about 51.7 lakh rooftop installations and 61.4 lakh households benefited by 9 October 2026, against a scheme target of 1 crore households by 31 March 2027.
  2. The installation pace more than tripled in nine months, from about 5,000 per day in October 2025 to about 16,300 per day in July 2026.
  3. Our analysis shows the target needs roughly 22,300 to 27,900 installations per day from October 2026 to March 2027, which is 1.4x to 1.7x the July 2026 pace.
  4. Rooftop solar added about 9.8 GW in January to September 2026, taking cumulative rooftop capacity to about 33.4 GW. Q2 2026 was the strongest quarter.
  5. The binding constraint has moved from demand to supply: India's enlisted cell capacity (about 30 GW) is a fraction of its module capacity (about 194 GW), and DCR modules carry an approximate premium of ₹8 to ₹11 per watt over non-DCR.
  6. From 1 January 2027, net-metered C&I rooftop projects must also use ALMM List-II cells, adding a second source of demand for the same limited domestic cell supply.
Methodology and how to read this report
This report combines official scheme figures (MNRE, PM Surya Ghar National Portal counters as publicly reported), capacity data from JMK Research, and ALMM notifications from MNRE. Quarterly rooftop figures for Q2 and Q3 2026 are derived by subtracting reported cumulative totals (H1 minus Q1, nine-month minus H1). "Required pace" and the three outlook scenarios are Headsup B2B estimates, not official projections. Module prices are approximate industry ranges, not Headsup B2B quotes; actual prices vary by brand, wattage, order size and location, and final quotes are inclusive of GST.
Contents
  1. 01Background: From a Decade-Long Trickle to a Mass Programme
  2. 02Where the Market Stands in October 2026
  3. 03Demand Analysis: The Pace Problem
  4. 04Supply Analysis: Cells, Not Modules, Are the Bottleneck
  5. 05What Has Changed for Vendors and the Supply Chain
  6. 06Outlook to 31 March 2027: Three Scenarios
  7. 07Risks and Indicators to Watch
  8. 08Frequently Asked Questions
Context

Background: From a Decade-Long Trickle to a Mass Programme

PM Surya Ghar: Muft Bijli Yojana was launched in February 2024 with an outlay of ₹75,021 crore and a target of rooftop solar for 1 crore households by the end of FY 2026-27. The scale change is clear when set against history: in the ten years before the scheme, India installed about 7.94 lakh residential rooftop systems. The scheme crossed 50 lakh installations in roughly two and a half years.

The central financial assistance (CFA) structure has stayed stable: ₹30,000 per kW for the first 2 kW, ₹18,000 for the third kW, and a cap of ₹78,000 per household. Several states add their own top-up, which is one reason uptake differs widely between states.

Market

Where the Market Stands in October 2026

IndicatorLatest figureAs of
Applications on National Portal~90.3 lakh9 Oct 2026
Rooftop installations~51.7 lakh9 Oct 2026
Households benefited~61.4 lakh9 Oct 2026
Record monthly additions~5.06 lakh homesJuly 2026
Concessional loans sanctioned~21.9 lakh applicantsAug 2026
Installations completed via loans~17.5 lakhAug 2026
Utility-Led Aggregation installs (PMAY, BPL, SC/ST)~1.6 lakh in 4 states; approved in 12Aug 2026
Registered vendors37,000+Oct 2026

Two points stand out. First, the gap between applications (about 90 lakh) and installations (about 52 lakh) is a pipeline of roughly 38 lakh homes that have applied but not yet installed. Second, about one in three installations has been financed through a loan, which means vendor cash flow increasingly depends on bank disbursement timelines, not only on customer payments.

Capacity view: rooftop solar's strongest year

Across all segments (residential, commercial and industrial), India added about 9.8 GW of rooftop solar in January to September 2026. H1 2026 alone added about 6.4 GW, more than double H1 2025. JMK Research attributes the majority of H1 rooftop additions to PM Surya Ghar.

Figure 1 — Rooftop solar capacity added per quarter, 2026 (GW)
Q1 2026
2.14 GW
Q2 2026
4.26 GW
Q3 2026
3.40 GW

Q2 and Q3 derived from cumulative H1 (6.4 GW) and nine-month (9.8 GW) totals. Source: JMK Research (Q1, H1 and nine-month 2026 reports); Headsup B2B calculation for Q2 and Q3.

Demand

Demand Analysis: The Pace Problem

The scheme's headline target is 1 crore households by 31 March 2027. Between 9 October 2026 and 31 March 2027 there are 173 days. Dividing the remaining gap by those days gives the required daily pace. Because the portal reports both "installations" and "households benefited" (the latter includes multi-household arrangements), we calculate both.

Figure 2 — Daily installations: actual vs required to hit 1 crore
Actual, Oct 2025
5,038
Actual, Jul 2026
16,328
Required (households basis)
~22,300
Required (installations basis)
~27,900

Required pace = (1 crore − figure on 9 Oct 2026) ÷ 173 days to 31 Mar 2027. Source: MNRE / DD India (actual pace); PM Surya Ghar National Portal counter as reported on 9 Oct 2026; Headsup B2B calculation.

Even on the more favourable households basis, the programme needs about 1.4x its best-ever monthly pace, sustained for six months. On an installations basis it needs about 1.7x. This explains why industry reports in 2026 say the Centre is considering an extension of three to four months beyond March 2027. As of mid-October 2026, no extension has been officially notified, so vendors should plan around 31 March 2027 as the working deadline.

Supply

Supply Analysis: Cells, Not Modules, Are the Bottleneck

Every PM Surya Ghar system must use DCR modules: panels assembled in India using cells also made in India. ALMM List-II, which lists approved domestic cell manufacturers, came into force on 1 June 2026. India's module base has grown fast, but cell capacity has not kept pace.

Figure 3 — Manufacturing capacity vs demand context (GW)
ALMM-enlisted modules (May 2026)
~194 GW
ALMM List-II cells (Apr 2026)
~30 GW
All solar added, Jan–Sep 2026
~35.2 GW

Enlisted capacity is nameplate; actual output is lower. Source: reGlobal (ALMM module capacity, May 2026); MNRE ALMM List-II revisions as reported by TaiyangNews and PV Tech; JMK Research via PV Tech (installations).

The result is a two-price market. Industry pricing surveys through 2026 put DCR modules at roughly ₹8 to ₹11 per watt above comparable non-DCR modules. Cell capacity is rising with each ALMM List-II revision (MNRE issued its 12th revision on 8 October 2026), so this premium should narrow over time, but not before the scheme deadline.

Worked model

What the DCR premium means for a 3 kW home

System size
3 kW = 3,000 watts of modules
Approximate DCR premium
₹8 to ₹11 per watt
Extra module cost vs non-DCR
About ₹24,000 to ₹33,000
Maximum central subsidy for 3 kW
₹78,000

Roughly 30% to 40% of the central subsidy is absorbed by the DCR premium. All figures are approximate and indicative; actual quotes are inclusive of GST and vary by brand and location.

The January 2027 pinch point

MNRE's Office Memorandum of 18 July 2026 exempted net-metering and open-access projects from ALMM List-II until 31 December 2026. After that date, net-metered commercial and industrial rooftops must also use List-II cells. From January 2027, residential PM Surya Ghar demand and C&I net-metering demand will compete for the same domestic cell supply, at exactly the time the scheme needs its fastest-ever pace.

Vendors

What Has Changed for Vendors and the Supply Chain

AreaBefore (2024–25)Now (late 2026)Implication
CompetitionFew thousand active installers37,000+ registered vendorsPrice pressure; differentiation through service and speed
Module sourcingDCR easily availableCell-constrained DCR supplyLock prices and delivery dates in writing; verify List-II cells
Customer financeMostly cashAbout 1 in 3 installs via loanCash flow tied to bank disbursement timelines
SegmentsIndividual homesHomes + RWAs + Utility-Led AggregationLarger aggregated orders through DISCOMs and societies
Deadline riskDistant31 Mar 2027 (extension not notified)Plan for a post-scheme demand dip

Demand for balance-of-system items scales directly with installations. At an assumed average of about 3 kW per home, every 1 lakh installations needs roughly 300 MW of modules, plus matching inverters, mounting structures, DC and AC cables, distribution boxes and earthing kits. Vendors who secure these items through consolidated procurement rather than piecemeal buying are better placed to protect margins.

Sourcing DCR modules and BOS for rooftop projects?

Headsup B2B helps rooftop solar vendors and EPCs source DCR modules, inverters and balance-of-system items in bulk from verified suppliers.

Outlook

Outlook to 31 March 2027: Three Scenarios

Downside
~72 lakh installations

Pace falls to about 12,000 per day as DCR cell supply tightens in Q1 2027 and DISCOM inspection backlogs build. Extension becomes very likely.

Base case
~80 lakh installations

July 2026 pace of about 16,300 per day holds. Households benefited moves closer to 1 crore through RWA and Utility-Led Aggregation, but installations fall short.

Upside
~90 lakh installations

Pace rises to about 22,000 per day on faster loan processing and new List-II cell capacity coming online. Target is broadly met on a households basis.

Scenario values = installations on 9 Oct 2026 + assumed daily pace × 173 days. Headsup B2B estimates, not official projections.

Risks

Risks and Indicators to Watch

RiskIndicator to watch
DCR cell shortage deepensTotal List-II capacity in each new ALMM revision; DCR module price trend
C&I demand crowds out residential supplyWhether the 31 Dec 2026 net-metering exemption is extended again
Post-March 2027 demand cliffOfficial notification of a scheme extension or a follow-on phase
Vendor payment delaysLoan sanction-to-disbursement time on Jan Samarth
DISCOM bottlenecksState-wise gap between applications and installations on the National Portal
FAQ

Frequently asked questions

How many homes have installed rooftop solar under PM Surya Ghar?+

About 51.7 lakh installations and 61.4 lakh households benefited, according to the National Portal counter on 9 October 2026.

Will PM Surya Ghar reach 1 crore homes by March 2027?+

Our analysis suggests it needs 1.4x to 1.7x its best monthly pace for six months. An extension of three to four months has been reported as under consideration, but nothing has been notified as of mid-October 2026.

Why are DCR solar panels more expensive?+

DCR panels must use Indian-made cells, and India's enlisted cell capacity (about 30 GW) is far smaller than its module capacity. This shortage creates an approximate premium of ₹8 to ₹11 per watt over non-DCR panels.

What changes for rooftop solar on 1 January 2027?+

The ALMM List-II exemption for net-metering and open-access projects ends on 31 December 2026. After that, net-metered C&I rooftop projects must also use List-II cells.

How large is India's rooftop solar market now?+

Cumulative rooftop solar capacity reached about 33.4 GW by September 2026, after about 9.8 GW was added in the first nine months of the year.

References
  1. MNRE, PM Surya Ghar: Muft Bijli Yojana scheme guidelines (outlay, CFA, implementation period). pmsuryaghar.gov.in
  2. PM Surya Ghar National Portal counter (applications, installations, households), 9 October 2026, as reported by Blues Renewables. bluesrenewables.com/blog/pm-surya-ghar-last-date/
  3. DD India, "PM Surya Ghar Scheme crosses 50 lakh rooftop solar installations", August 2026. ddindia.co.in/2026/08/pm-surya-ghar-scheme-crosses-50-lakh-rooftop-solar-installations/
  4. SolarQuarter, "PM Surya Ghar Scheme Crosses 50 Lakh Rooftop Solar Installations, Adds Record 5.06 Lakh Homes In July 2026", 7 August 2026. solarquarter.com/2026/08/07/pm-surya-ghar-scheme-crosses-50-lakh-rooftop-solar-installations-adds-record-5-06-lakh-homes-in-july-2026/
  5. Republic World, "PM Surya Ghar Scheme Emerges as Green Jobs Engine, Over 37,000 Vendors Join Network", 15 October 2026. republicworld.com/india/exclusive-pm-surya-ghar-scheme-emerges-as-green-jobs-engine-over-37000-vendors-join-network-2026-10-15-138977
  6. JMK Research, "India Installs Record 26 GW Solar and 3 GW Wind Capacity in H1 2026". jmkresearch.com/india-installs-record-26-gw-solar-and-3-gw-wind-capacity-in-h12026/
  7. PV Tech, "India adds 35.2GW of solar capacity in nine months—report", October 2026. pv-tech.org/india-adds-35-2gw-of-solar-capacity-in-nine-months-report/
  8. PV Tech, "MNRE extends ALMM List-II exemption for net-metering and open access solar projects", July 2026. pv-tech.org/mnre-extends-almm-list-ii-exemption-for-net-metering-and-open-access-solar-projects/
  9. Renewable Watch, "MNRE extends ALMM List-II exemption for net-metering and open access projects till December 31, 2026", 21 July 2026. renewablewatch.in/2026/07/21/mnre-extends-almm-list-ii-exemption-for-net-metering-and-open-access-projects-till-december-31-2026/
  10. reGlobal, "Record capacity additions and diversification drive India's solar sector", 2026. reglobal.org/record-capacity-additions-and-diversification-drive-indias-solar-sector/
  11. Anantam IAS (citing The Indian Express), "Domestic Solar Cell Sourcing: Limited Window Extended to December 31", July 2026. anantamias.com/current-affairs/solar-cell-sourcing-mandate-deferral/
  12. Heaven Green Energy, "DCR vs Non-DCR Solar Panels: Meaning, Price Gap, Rules", October 2026 (industry pricing survey). heavengreenenergy.com/blog/dcr-vs-non-dcr-solar-panels
Procurement support

Secure DCR supply before the March 2027 rush

Headsup B2B helps rooftop solar vendors and EPCs source DCR modules, inverters and balance-of-system items in bulk.

✓ Verified suppliers✓ DCR modules✓ Inverters & BOS✓ Pan-India logistics

No obligation · Response within 24 hours

Published 20 October 2026 by Headsup B2B Research. Data as of 15 October 2026; next review January 2027.

Disclaimer: All prices in this report are approximate industry ranges for information only and are not Headsup B2B quotes. Scheme figures change frequently; verify current details on pmsuryaghar.gov.in before making decisions.

India rooftop solar market 2026
PM Surya Ghar installations
PM Surya Ghar 1 crore target
DCR module price
DCR vs non-DCR premium
ALMM List-II cells
rooftop solar vendors India
net metering ALMM 2027
rooftop solar capacity India
solar supply chain India
HEADSUP B2B
Loading categories...