- 01Why biomass pellet demand exists
- 02Mandate vs reality: the demand–supply gap
- 03Who is actually buying pellets
- 04How pellet prices are set: the benchmark
- 05Government support for pellet plants
- 06Worked model: a 2 TPH pellet plant
- 07Sensitivity: what makes or breaks margins
- 08Quality specs buyers check
- 09FAQs and key takeaways
Cumulative biomass usage across India’s thermal power plants stood at about 6.10 million tonnes as of 15 June 2026, with 75 plants having co-fired pellets at least once. Against a 5% co-firing requirement, the SAMARTH Mission estimates pellet demand of roughly 38.55 million tonnes a year for India’s coal fleet.
That is the gap — and the opportunity. The policy is in place. The price benchmark is in place. Supply, quality and logistics are not.
1. Why Biomass Pellet Demand Exists
The demand is policy-driven. The Ministry of Power set up the National Mission on Use of Biomass in Thermal Power Plants — SAMARTH — in July 2021. A revised biomass policy in October 2021 mandated 5% biomass pellet co-firing for 2024-25 and 7% for 2025-26. A comprehensive policy covering biomass and torrefied municipal solid waste was introduced in 2025.
Three goals sit behind the mandate.
- Cut stubble burning, which drives winter air pollution across North India.
- Reduce coal use and the carbon footprint of thermal power.
- Create rural income from crop residue that is otherwise burnt.
India generates over 500 million tonnes of agricultural residue each year, with an estimated 140 million tonnes surplus after fodder and other uses. Raw material is not the constraint. Collection, pelletising and transport are.
2. Mandate vs Reality: The Demand–Supply Gap
| Metric | Figure | Source context |
|---|---|---|
| Coal-based TPP capacity considered | 213 GW | SAMARTH Mission report |
| Pellets required at 5% co-firing | 38.55 million tonnes per year | SAMARTH Mission report |
| Biomass required at 5% co-firing | 105,610 tonnes per day | SAMARTH Mission report |
| Cumulative usage, all India (to 15 Jun 2026) | ~6.10 million tonnes | 75 plants; 22 NTPC + 53 others |
| Cumulative usage, NCR plants (to 15 Jun 2026) | ~4.38 million tonnes | NCR is the main co-firing hub |
| NCR usage, FY2025-26 | ~2.16 million tonnes | Up from 1.30 MT in FY2024-25 |
| NCR average co-firing rate, FY2025-26 | 4.61% | Up from 2.60% in FY2024-25 |
Source: Figures compiled from the SAMARTH Mission report (as cited by CSE) and Power Line (September 2026), as of November 2026.
Even the best-performing region, NCR, averaged 4.61% co-firing in FY2025-26 — below the 5% mandate. Outside NCR, adoption is far thinner. Cumulative national usage over several years is still a fraction of a single year’s requirement.
“The mandate created the demand. Supply chains have not caught up — and that is where the business is.”
3. Who Is Actually Buying Pellets
| Buyer segment | Why they buy | How they buy |
|---|---|---|
| Coal-based thermal power plants | Co-firing mandate under SAMARTH | Tenders; long- and short-term supply contracts |
| NTPC and central PSUs | Largest co-firing programme; 22 NTPC plants have co-fired | Large tenders with quality specs |
| Industrial boilers (textile, food, paper) | Fuel cost and emission compliance | Direct purchase, regional suppliers |
| Commercial heating and cooking | Cleaner alternative to coal or wood | Retail and small bulk orders |
Source: Headsup B2B analysis based on Power Line (September 2026) and SAMARTH Mission information, as of November 2026.
For buyers new to sourcing, see our guide on how to find reliable biomass pellet suppliers.
4. How Pellet Prices Are Set: The Benchmark
To stabilise procurement, the Ministry of Power issued benchmark prices for non-torrefied biomass pellets, expressed per 1,000 kcal of calorific value. The benchmark excludes GST and transport from the pellet plant.
| Region | Benchmark (₹ per 1,000 kcal) | Pellet type |
|---|---|---|
| National Capital Region (NCR) | ₹2.32 | Non-torrefied |
| Northern Region (excluding NCR) | ₹2.27 | Non-torrefied |
| Western Region | ₹2.24 | Non-torrefied |
| NCR (reported, Nov 2024–Nov 2025) | ₹2.58 | Torrefied |
Source: Ministry of Power notifications dated 23.08.2023 and 08.11.2023 (as reported in Lok Sabha reply); torrefied benchmark as reported by industry sources. Excludes GST and transport. Check the latest notification on samarth.powermin.gov.in.
Converting the benchmark to ₹ per tonne
A tonne of pellets at 3,200 kcal/kg carries 3.2 million kcal. At the NCR benchmark of ₹2.32 per 1,000 kcal, that works out to about ₹7,424 per tonne ex-plant, before GST and freight.
| Pellet GCV | NCR (₹/tonne) | Northern ex-NCR (₹/tonne) | Western (₹/tonne) |
|---|---|---|---|
| 2,800 kcal/kg | ₹6,496 | ₹6,356 | ₹6,272 |
| 3,000 kcal/kg | ₹6,960 | ₹6,810 | ₹6,720 |
| 3,200 kcal/kg | ₹7,424 | ₹7,264 | ₹7,168 |
| 3,400 kcal/kg | ₹7,888 | ₹7,718 | ₹7,616 |
Source: Headsup B2B calculation from Ministry of Power benchmark prices. The NCR benchmark applies to pellets with moisture below 14% and GCV of 2,800–3,400 kcal/kg. Indicative, ex-plant, excluding GST and transport.
The arithmetic is the point. Calorific value is money. Every 200 kcal/kg of GCV is worth roughly ₹460 per tonne at the NCR benchmark.
5. Government Support for Pellet Plants
| Scheme | Support | Cap |
|---|---|---|
| MNRE Bioenergy Programme — non-torrefied | ₹21 lakh per MTPH or 30% of plant & machinery cost, whichever is lower | ₹105 lakh |
| MNRE Bioenergy Programme — torrefied | ₹42 lakh per MTPH or 30% of plant & machinery cost, whichever is lower | ₹210 lakh |
| CPCB (EPC funds) — torrefied | ₹28 lakh per TPH | As per CPCB guidelines |
| IREDA term loan | Up to 70% of project cost (projects up to ₹5 Cr) | Minimum loan ₹50 lakh |
Source: Figures compiled from MNRE revised CFA (July 2024, via SolarQuarter), Down To Earth (CPCB guidelines) and IREDA scheme details, as of November 2026. Verify current scheme terms before applying.
- Feedstock is seasonal — paddy straw availability peaks for a few weeks a year.
- Storage and moisture control decide quality more than machinery does.
- Power plant tenders reject pellets that miss GCV, ash or moisture specs.
- Working capital gets locked in inventory between harvest and dispatch.
6. Worked Model: A 2 TPH Pellet Plant
This model tests whether a mid-size non-torrefied plant supplying a thermal power plant in NCR can work. All inputs are assumptions.
Illustrative model based on Ministry of Power benchmark and indicative industry costs, November 2026. Excludes GST, freight, interest, tax, depreciation and working capital. Not financial advice — run your own numbers and consult your CA.
7. Sensitivity: What Makes or Breaks Margins
| Variable | Amount | Result | Impact on viability |
|---|---|---|---|
| Base case | 3,100 kcal/kg; ₹6,200/t; 100% | ₹1.19 Cr/yr; payback 1.7 yrs | Viable at benchmark price ✓ |
| Pellet GCV | 2,800 kcal/kg | ₹0.36 Cr/yr; payback 5.9 yrs | Lower realisation per tonne |
| Pellet GCV | 3,400 kcal/kg | ₹2.03 Cr/yr; payback 1.0 yrs | Better feedstock pays |
| Production cost | ₹6,800 per tonne | ₹0.47 Cr/yr; payback 4.4 yrs | Feedstock or power cost spike |
| Utilisation | 60% | ₹0.71 Cr/yr; payback 2.9 yrs | Feedstock shortage or tender gaps |
Source: Illustrative only, using the worked-model assumptions with one variable changed at a time. NCR non-torrefied benchmark of ₹2.32 per 1,000 kcal. Not financial advice.
The margin is thin enough that utilisation and calorific value matter more than machinery cost. A plant that runs short of feedstock for four months loses most of its advantage.
8. Quality Specs Buyers Check
| Parameter | Why it matters | What buyers ask for |
|---|---|---|
| Moisture | High moisture lowers heat value and causes storage problems | Below 14% for the NCR benchmark |
| Gross calorific value (GCV) | Directly sets the price per tonne | 2,800–3,400 kcal/kg band for the NCR benchmark |
| Ash content | High ash causes slagging and boiler wear | As per tender specification |
| Size and durability | Fines and breakage cause handling losses | Uniform diameter, low fines |
| Consistency | Plants need predictable feed | Batch test certificates |
Source: Ministry of Power benchmark conditions (via Power Line) and common tender requirements, as of November 2026. Always follow the buyer’s tender specification.
Background on pellets and how they are made: what are pellets and how biomass pellets are made. Supplier landscape: biomass pellet manufacturers in India.
What This Means for Each Player
| Player | Opportunity | Main risk | Action |
|---|---|---|---|
| Pellet manufacturer | Large, policy-backed demand at a notified benchmark | Feedstock seasonality and quality rejection | Secure residue contracts and test every batch |
| Thermal power plant | Meet the co-firing mandate | Unreliable supply and inconsistent quality | Multi-supplier contracts with GCV-linked pricing |
| Industrial boiler user | Lower-emission fuel with stable pricing | Boiler compatibility and ash handling | Trial runs before switching volumes |
| Investor / lender | Asset-light rural manufacturing with subsidy support | Working capital and utilisation | Underwrite on utilisation, not nameplate capacity |
Source: Headsup B2B Procurement Research analysis, November 2026.
9. FAQs
What is the biomass co-firing mandate in India?+
The Ministry of Power mandated 5% biomass pellet co-firing in coal-based thermal power plants for 2024-25, rising to 7% for 2025-26. The SAMARTH Mission oversees implementation.
How big is the biomass pellet market in India?+
At 5% co-firing, the SAMARTH Mission estimates demand of about 38.55 million tonnes of pellets a year for the coal fleet. Actual cumulative usage was about 6.10 million tonnes by June 2026, so most demand is still unmet.
What is the benchmark price of biomass pellets?+
The Ministry of Power benchmark for non-torrefied pellets is ₹2.32 per 1,000 kcal in NCR, ₹2.27 in the Northern Region excluding NCR and ₹2.24 in the Western Region, excluding GST and transport.
What is the price of biomass pellets per tonne?+
At the NCR benchmark, a pellet with 3,200 kcal/kg GCV works out to about ₹7,424 per tonne ex-plant, before GST and freight. Actual prices depend on GCV, ash, moisture and contract terms.
Is there a subsidy for setting up a pellet plant?+
Yes. MNRE provides ₹21 lakh per MTPH for non-torrefied plants (capped at ₹105 lakh) and ₹42 lakh per MTPH for torrefied plants (capped at ₹210 lakh), or 30% of plant and machinery cost, whichever is lower.
Which plants use the most biomass pellets?+
Thermal power plants in the NCR lead, with about 4.38 million tonnes of cumulative usage by June 2026. NTPC has 22 plants that have co-fired biomass.
What is the difference between torrefied and non-torrefied pellets?+
Torrefied pellets are roasted at high temperature, which raises energy density and makes them more coal-like. They cost more to produce and carry a higher benchmark price and higher subsidy.
- India’s co-firing mandate creates demand of tens of millions of tonnes of pellets a year.
- Actual supply remains a small fraction of the requirement.
- Calorific value sets price — every 200 kcal/kg is worth about ₹460 per tonne at the NCR benchmark.
- Utilisation and feedstock security matter more than machinery cost.
- Government support lowers capex, but working capital remains the real constraint.
- Buyers should contract on GCV, moisture and ash — not on price alone.
Buying or Supplying Biomass Pellets?
Verified supplier network · Pan-India delivery · Collateral-free credit for verified buyers
Explore biomass solutions on Headsup B2B.
Published 24 November 2026 by the Headsup B2B Editorial Team · Procurement Intelligence. Data as of 24 November 2026.
Disclaimer: Figures are compiled from the SAMARTH Mission report (as cited by CSE), Power Line (September 2026), Ministry of Power benchmark notifications, MNRE Bioenergy Programme guidelines, Down To Earth and IREDA scheme information, and are indicative as of November 2026. Benchmark prices and scheme terms change — verify the latest notifications on samarth.powermin.gov.in and with MNRE before acting. Worked models are illustrative and not financial advice; consult your CA.