- 01On-Grid vs Hybrid vs Off-Grid: The Simple Difference
- 02Which System Qualifies for PM Surya Ghar Subsidy
- 03What Size Solar System Does Your Home Need
- 04What Makes a Solar System “the Best”
- 05Example: A Family Using 250 Units a Month
- 06How to Decide: On-Grid or Hybrid
- 07How to Get It Installed Under PM Surya Ghar
- For most homes, an on-grid solar system is the best value — lowest cost and fully eligible for the PM Surya Ghar subsidy.
- Choose a hybrid system (on-grid + battery) only if you face frequent power cuts. The subsidy applies to the solar panels, not the battery.
- Off-grid systems are not eligible for the PM Surya Ghar subsidy.
- Size it by your bill: 0–150 units/month → 1–2 kW; 150–300 units → 2–3 kW; above 300 units → above 3 kW.
- Maximum central subsidy is ₹78,000 for 3 kW and above.
On-Grid vs Hybrid vs Off-Grid: The Simple Difference
All three systems use the same kind of solar panels on your roof. The difference is where the extra power goes and what happens when the grid goes off.
| Feature | On-grid | Hybrid | Off-grid |
|---|---|---|---|
| Connected to electricity grid | Yes | Yes | No |
| Battery | No | Yes | Yes |
| Works during power cut | No (shuts off for safety) | Yes, from battery | Yes, from battery |
| Net metering (sell extra power) | Yes | Yes | No |
| PM Surya Ghar subsidy | Yes | Yes, on solar capacity only* | No |
| Upfront cost | Lowest | Higher (battery adds cost) | Higher |
| Best for | Cities with stable power | Areas with frequent cuts | Remote homes without grid |
Source: PM Surya Ghar scheme guidelines; MNRE. *Hybrid eligibility is subject to your State Electricity Regulatory Commission and DISCOM approval.
Which System Qualifies for PM Surya Ghar Subsidy
The scheme supports grid-connected rooftop solar for residential homes. That means:
- On-grid: eligible.
- Hybrid (grid-connected with battery): eligible, but the subsidy is calculated on the solar module capacity only. The battery gets no subsidy, and approval depends on your state regulator and DISCOM.
- Off-grid: not eligible, because it is not connected to the grid.
- Panels must be Made-in-India DCR modules, and installation must be done by a registered vendor.
| System size | Central subsidy |
|---|---|
| 1 kW | ₹30,000 |
| 2 kW | ₹60,000 |
| 3 kW and above | ₹78,000 (maximum) |
Source: PM Surya Ghar: Muft Bijli Yojana — ₹30,000/kW up to 2 kW, ₹18,000/kW for additional capacity up to 3 kW, capped at ₹78,000 (pmsuryaghar.gov.in). Special category states get additional support — check the portal.
What Size Solar System Does Your Home Need
Look at your last 6–12 electricity bills and take the average monthly units. Then use the official guidance:
| Average monthly units | Suitable system | Subsidy |
|---|---|---|
| 0–150 | 1–2 kW | ₹30,000 – ₹60,000 |
| 150–300 | 2–3 kW | ₹60,000 – ₹78,000 |
| Above 300 | Above 3 kW | ₹78,000 |
Source: PIB / MNRE factsheet on PM Surya Ghar; pmsuryaghar.gov.in.
Still deciding between sizes? Compare them side by side in 1 kW vs 2 kW vs 3 kW solar system for home.
What Makes a Solar System “the Best”
The best system is not the most expensive one. It is the one with the right parts, installed properly, that keeps generating for 25 years. Check these five things:
- DCR solar panels. Made-in-India panels from manufacturers on MNRE’s approved list. Required for the subsidy.
- A good inverter. On-grid inverter for on-grid systems, hybrid inverter if you add a battery. Check warranty and after-sales service in your city.
- Strong mounting structure. Galvanised or rust-resistant structure designed for wind load on your roof.
- Proper earthing and safety. Earthing, lightning protection and correctly sized DC and AC cables.
- Net meter and DISCOM approval. Your vendor should handle the net-metering paperwork with the DISCOM.
How the net meter works and how your bill is calculated: PM Surya Ghar net metering.
Example: A Family Using 250 Units a Month
Here is how a typical family might decide. The numbers below are for illustration only.
| Illustrative example — 250 units/month household | |
|---|---|
| Average monthly use | 250 units |
| Suggested system | 3 kW on-grid |
| Central subsidy | ₹78,000 |
| Expected generation | 300+ units/month (average, as per PIB) |
| Monthly units saved | ~250 units (surplus exported via net meter) |
| Bill saving at an assumed ₹7/unit | ~₹1,750 per month |
How to Decide: On-Grid or Hybrid
- Power cuts are rare (a few hours a month): go on-grid. You save the most money for every rupee spent.
- Power cuts are frequent or long: consider hybrid. You pay more upfront for the battery, but your fans, lights and fridge keep running.
- You already own an inverter-battery: many families install on-grid solar and keep their existing inverter for backup.
- Budget is tight: on-grid with a smaller system is better than a hybrid you cannot finance. Check the PM Surya Ghar loan option.
How to Get It Installed Under PM Surya Ghar
- Register on the national portal. Apply at pmsuryaghar.gov.in with your electricity consumer number.
- Get feasibility approval. Your DISCOM checks and approves the application.
- Choose a registered vendor. Compare quotes for the same system size, DCR panels and inverter — see how to choose a PM Surya Ghar vendor.
- Installation and net metering. The vendor installs the system; DISCOM inspects and fits the net meter.
- Subsidy credit. After commissioning, the subsidy is credited to your bank account.
Full step-by-step details are in our PM Surya Ghar how to apply guide. For everything about the scheme, see the PM Surya Ghar hub.
Disclaimer: Subsidy amounts, eligibility rules and DISCOM requirements can change. Always verify current guidelines on pmsuryaghar.gov.in and with your DISCOM before applying. Savings shown are illustrative and not financial advice.
Frequently asked questions
Which solar system is best for home under PM Surya Ghar?+
For most homes, an on-grid rooftop solar system is the best choice. It has the lowest cost, earns net-metering credit and is fully eligible for the subsidy of up to ₹78,000.
Is a hybrid solar system eligible for PM Surya Ghar subsidy?+
Yes, a grid-connected hybrid system can be eligible, subject to your state regulator and DISCOM approval. The subsidy is calculated only on the solar panel capacity — the battery does not get any subsidy.
Can I get subsidy on an off-grid solar system?+
No. PM Surya Ghar covers grid-connected rooftop solar only. Off-grid, battery-only systems are not eligible.
What size solar system do I need for 200 units a month?+
Households using 150–300 units a month are advised a 2–3 kW system. For 200 units, a system of about 2–3 kW is usually suitable, depending on roof space and sunlight.
How much electricity does a 3 kW solar system generate?+
As per government data, a 3 kW rooftop system generates over 300 units a month on average. Actual output depends on your location, roof direction and shading.
Do I need DCR panels for PM Surya Ghar?+
Yes. Only Made-in-India DCR solar panels from approved manufacturers are eligible for the subsidy. Imported or non-DCR panels will disqualify the application.
Will on-grid solar work during a power cut?+
No. On-grid inverters shut down when the grid fails, for the safety of line workers. If you need backup, choose a hybrid system or keep your existing inverter-battery.