- 01Scheme kya hai — subsidy kitni milti hai
- 02Eligibility criteria — kaun apply kar sakta hai
- 03Documents checklist — kya kya chahiye
- 048 rejection reasons — aur unke fixes
- 05Application process — step by step
- 06Timeline — kitna time lagta hai
- 07Key takeaways
Ghar ke malik, kisan, aur solar installers
PM Surya Ghar Muft Bijli Yojana February 2024 mein launch hui — ₹75,021 crore ki yojana jisme government rooftop solar pe seedha bank account mein subsidy deti hai. August 2025 tak 8,03,515 applications aayi — lekin 3,05,667 applications reject ho gayin. Rejection rate 38% hai.
Rejection ki wajah technical nahi hai. Zyaadatar rejections documents ki galti se hoti hain — name mismatch, incomplete scans, wrong bank account, ya non-empanelled installer. Yeh sab cheezein apply karne se pehle fix ho sakti hain. Yeh guide aapko exactly wahi batati hai jo DISCOM aur bank verify karte hain — aur kaise pehli baar mein approve karaya jaye.
Scheme kya hai — subsidy kitni milti hai
PM Surya Ghar Muft Bijli Yojana ek Central Government scheme hai jisme ghar ki chhat pe solar panel lagwane par CFA (Central Financial Assistance) milti hai — seedha aapke Aadhaar-linked bank account mein. Koi middleman nahi. Koi cash nahi. Direct Bank Transfer (DBT).
| System capacity | Subsidy amount | Approx. free bijli/month | Best for |
|---|---|---|---|
| 1 kW | ₹30,000 | ~100 units | 1–2 member family, low consumption |
| 2 kW | ₹60,000 | ~200 units | Small family, 2–3 BHK |
| 3 kW | ₹78,000 (max) | ~300 units | Medium family — sabse popular choice |
| 3 kW se zyada | ₹78,000 (cap — nahi badhta) | 300+ units | Large family — extra capacity apne kharche pe |
Source: MNRE PM Surya Ghar official guidelines, October 2026. Subsidy amounts samay ke saath change ho sakte hain — apply karne se pehle pmsuryaghar.gov.in pe verify karein. State-wise rates ke liye hamari subsidy amount guide dekhein.
Eligibility criteria — kaun apply kar sakta hai
| Eligibility condition | Detail | Status |
|---|---|---|
| Valid electricity connection | DISCOM consumer number hona chahiye — bijli connection aapke naam pe | Mandatory |
| Residential property ownership | Property owner ya registered lessee — tenant apply nahi kar sakte bina owner NOC ke | Mandatory |
| On-grid solar system | Sirf grid-connected system eligible hai — off-grid system pe subsidy nahi milti | Mandatory |
| MNRE empanelled installer | Installation sirf registered vendor se honi chahiye — koi bhi local electrician nahi kar sakta | Mandatory |
| CIBIL score (loan ke liye) | Bank loan chahiye toh minimum 680 CIBIL score required — subsidy ke liye CIBIL nahi chahiye | Loan applicants only |
| No pending electricity dues | DISCOM account mein koi arrears nahi hone chahiye — outstanding dues se application reject | Mandatory |
| Prior subsidy claim | Usi property pe pehle koi subsidy claim nahi honi chahiye — system already flagged ho jaata hai | Disqualifying |
Source: pmsuryaghar.gov.in official eligibility guidelines aur MNRE scheme documentation, October 2026.
Documents checklist — pehle gather karo, phir apply karo
Incomplete documents rejection ka doosra sabse bada reason hai. Application portal pe jaane se pehle yeh sab ready rakhein — ek bhi document missing hone par application automatically hold mein chali jaati hai.
Yeh sab pehle se scan karke rakhein — minimum 300 DPI, PDF ya JPG
- Aadhaar Card — dono sides: Front aur back dono required. Sirf front scan karne par application reject hoti hai. Name exactly waise hona chahiye jaise electricity bill mein hai.
- Latest Electricity Bill: Last 3 mahine ka bill. Consumer number clearly visible hona chahiye. Bill aapke naam pe hona chahiye — dusre ke naam ka bill accepted nahi hoga.
- Bank Account Details — Aadhaar-linked: Account number aur IFSC code. Account wahi hona chahiye jo Aadhaar se linked hai — doosre account mein subsidy transfer nahi hogi.
- PAN Card: ₹50,000 se upar subsidy ke liye mandatory — 3 kW system pe hamesha required hoga. Minor differences se rejection hoti hai — name exactly match karna chahiye.
- Passport Size Photograph: Recent — 6 months se purani nahi. White background preferred.
- Property Ownership Proof: Property tax receipt, registry, ya sale deed. Registered lessee ke liye lease agreement + owner NOC.
In situations mein extra documents required hain
- Housing society flat (Maharashtra — Adani/Tata area): Society NOC ya resolution required — agar panels common rooftop pe lagne hain.
- Joint property: Co-owner ki NOC + signature required — akele apply karne par rejection guaranteed.
- Tenant (rented property): Landlord ki written NOC + property document — NOC mein clearly likha ho ki solar installation aur subsidy claim ki permission hai.
- Uttar Pradesh applicants: UPNEDA portal pe additional state-specific documents required — pmsuryaghar.gov.in ke saath UPNEDA portal bhi check karein.
- Existing solar system: Pehle se system laga hua hai toh DISCOM se eligibility confirm karein — sab existing installations qualify nahi karti.
MNRE empanelled solar equipment source karna hai?
8 rejection reasons — aur unke fixes
Public sector banks ne August 2025 tak 3,05,667 applications reject ki hain. Rejection ke 8 main reasons hain — aur sab pehle se avoid kiye ja sakte hain.
Documents missing ya illegible
Fix: Sabhi documents minimum 300 DPI pe scan karein. Name exactly electricity bill se match karna chahiye — ek bhi difference allowed nahi.
Non-empanelled installer se installation
Fix: Apply karne se pehle installer ka empanelment number verify karein — pmsuryaghar.gov.in pe vendor list available hai.
Off-grid system install kiya — on-grid apply kiya
Fix: Installation se pehle installer se confirm karein ki system on-grid hai aur DISCOM net metering se connected hoga.
Property ownership mismatch
Fix: Bill aur application same person ke naam pe honi chahiye. Koi bhi mismatch hai toh pehle DISCOM mein name transfer karwayein.
Net metering complete nahi hua
Fix: Installer se confirm karein ki net metering application aur DISCOM inspection part of their service hai — written mein lein.
Bank account Aadhaar-linked nahi hai
Fix: Apply karne se pehle apne bank mein jakar confirm karein ki account Aadhaar se linked hai. Ek chota sa transaction karein account activate karne ke liye.
Pending electricity dues
Fix: Apply karne se pehle latest electricity bill pay karein aur DISCOM portal pe confirm karein ki account clear hai.
Low CIBIL score (loan applications)
Fix: Loan nahi chahiye toh sirf subsidy ke liye apply karein — CIBIL issue nahi aayegi. Loan chahiye toh pehle CIBIL score check karein. Details hamari Jansamarth loan guide mein hain.
Rejection ek broken promise jaisi lagti hai
Application process — step by step
- pmsuryaghar.gov.in pe register karein. Mobile number se OTP verification. Consumer number daalo — yeh aapke electricity bill pe hota hai. Account ban jaata hai. Time: 10 minutes
- Rooftop solar application fill karein. System capacity choose karein (1, 2, ya 3 kW). Documents upload karein. MNRE empanelled installer select karein — portal pe list available hai. Time: 20–30 minutes (documents ready hain toh)
- DISCOM feasibility approval. DISCOM aapki application review karta hai — sanctioned load check karta hai, technical feasibility approve karta hai. SMS aata hai approval pe. Typically 7–15 working days
- Installation + net meter application. MNRE empanelled installer solar system lagata hai. Net metering application DISCOM mein file hoti hai. DISCOM inspection aata hai — net meter install hota hai. Installation: 1–3 days · Net meter approval: 15–30 days
- Commissioning report submit + subsidy disburse. Installer commissioning report portal pe upload karta hai. MNRE verify karta hai. Subsidy seedha Aadhaar-linked bank account mein aa jaati hai. Disbursement: 15–30 days after commissioning report
Portal ke har screen ka step-by-step walkthrough hamari how to apply guide mein hai.
Timeline — kitna time lagta hai
Illustrative timeline — 3 kW system, clean documents, efficient DISCOM:
| Stage | Duration |
|---|---|
| Registration + application (Day 1) | 30 minutes |
| DISCOM feasibility approval | 7–15 working days |
| Installation by empanelled vendor | 1–3 days |
| Net meter installation + DISCOM inspection | 15–30 days |
| Commissioning report + subsidy disbursement | 15–30 days |
| Total — clean documents ke saath | 60–90 days |
Illustrative timeline. Actual duration varies by state DISCOM efficiency aur application volume. Ek bhi correction required hone par 2–4 weeks extra lag sakte hain. Subsidy aane mein deri ho rahi hai toh subsidy not received guide dekhein.
Key takeaways
- 38% rejection rate ka reason technical nahi hai — documents ki galti, wrong installer, aur name mismatch — yeh sab pehle se fix ho sakti hain.
- MNRE empanelled installer check karna sabse pehla kaam hai — non-empanelled installer se installation karne par subsidy milti hi nahi, chahe system sahi lage.
- Name exact match karna zaroori hai — Aadhaar, PAN, electricity bill, aur bank account mein ek bhi spelling difference automated rejection trigger karta hai.
- Bank account Aadhaar-linked hona chahiye — subsidy DBT ke through aati hai, kisi bhi doosre account mein transfer nahi hogi.
- Apply karne se pehle electricity dues clear karein — koi bhi outstanding arrear application ko disqualify karta hai.
- Clean documents ke saath 60–90 din mein subsidy aa jaati hai — ek bhi correction hone par 2–4 weeks extra lagte hain.
Is guide mein di gayi jankari MNRE PM Surya Ghar official guidelines aur publicly available sources ke basis par hai, October 2026 tak. Subsidy amounts, eligibility criteria, aur DISCOM-specific requirements change ho sakte hain — apply karne se pehle hamesha pmsuryaghar.gov.in pe current guidelines verify karein. Yeh guide information ke liye hai — kisi bhi financial ya legal advice ke liye apne CA ya scheme helpline se sampark karein.
Frequently asked questions
Kya tenant PM Surya Ghar ke liye apply kar sakta hai?+
Haan — lekin sirf agar electricity connection tenant ke naam pe ho ya landlord written NOC de. NOC mein clearly likha hona chahiye ki solar installation aur subsidy claim ki permission hai. Bina NOC ke ya agar bill landlord ke naam pe hai aur application tenant kar raha hai — rejection guaranteed hai.
Subsidy ke liye CIBIL score kitna chahiye?+
Sirf subsidy ke liye apply kar rahe hain — bina bank loan ke — toh CIBIL score matter nahi karta. Bank loan ke saath apply kar rahe hain toh minimum 680 CIBIL score required hai. 3 lakh+ rejections mein se zyaadatar CIBIL wali loan applications hain — pure subsidy applications mein CIBIL issue nahi aata.
Kya koi bhi solar installer se kaam karwa sakte hain?+
Nahi. Sirf MNRE empanelled (registered Channel Partner) installer se installation karne par subsidy milti hai. Local electrician ya non-registered contractor se installation karne par application reject ho jaati hai — chahe system sahi bhi lage. Installer ka empanelment status pmsuryaghar.gov.in pe vendor list mein verify karein.
Application reject ho gayi — ab kya karein?+
Rejection reason portal pe dikhta hai — usse pehle read karein. Original rejection formally close hone ke baad hi resubmit kar sakte hain. Document issue hai toh correct karein aur resubmit karein. Installer issue hai toh MNRE empanelled installer se re-install karwana pad sakta hai — costly step, isliye pehle verify karna zaroori hai.
3 kW se bada system lagwayein toh zyada subsidy milegi?+
Nahi. Subsidy cap ₹78,000 hai — 3 kW pe. 5 kW ya 10 kW lagwao, subsidy ₹78,000 se zyada nahi hogi. 3 kW se badi capacity apne kharche pe lagwani padegi. Isliye zyaadatar ghar wale 3 kW tak ka system choose karte hain — maximum subsidy pe maximum free bijli.
Housing society flat mein apply kar sakte hain?+
Haan — lekin panels sirf aapke flat ki exclusive chhat pe lagni chahiye. Common rooftop pe panel lagwane ke liye society NOC/resolution required hai. Maharashtra mein Adani aur Tata electricity supply areas mein yeh document mandatory hai. Society ki permission ke bina common rooftop installation karne par legal aur application dono mein problem hoti hai.